Steam separators and binary equipment for geothermal projects

Jun 1st, 2012 to Jan 1st, 2019
Costa Rica
Type: State Trade Lead, Project Size: 70000000, Tags: Energy, Infrastructure, Power, Geothermal, Renewable, Environment, Energy, Electricity, Funding Source: Government, Status: Pipeline

After completing Pailas I project at Volcan Rincon de la Vieja, now Pailas II and Borinquen projects, both located in the same area, are in the row of Costa Rican Electric Institute (ICE) projects do be done. Each of these projects to produce 50 MW. Steam separators and binary equipment would be needed. ICE working on feasibilities studies.

DBC (AL) Combined Heat and Power Replacement at Hemel Sports Centre

Jan 1st, 0001 to May 14th, 2019
Any Region
Project Number: C000000980, Status: Open

The current CHP at Hemel Sports Centre is in need of replacement. The works involves the decommissioning and removal of the existing CHP plant in the basement plantroom, and the subsequent supply, installation, testing and commissioning of the new CHP, ancillary items, electrical installations and controls installation at Hemel Sports Centre.

Trans-Sahel Pipeline

Jan 1st, 2013 to Jan 1st, 2020
Niger
Type: State Trade Lead, Project Size: 2147483647, Tags: Energy, Pipeline, Funding Source: Other, Status: Pipeline

While the specifics on this project are still on the drawing board, this project has been discussed for several years but only recently gained traction. The proposed pipeline would stretch through northern Nigeria, cross Niger, and reach Algeria. It is uncertain who would fund this project, but recently numerous private entities and various governments have discussed their interest in this project.

20 MW solar, wind, run of river hydro projects

Nov 1st, 2013 to Jan 1st, 2020
Costa Rica
Type: State Trade Lead, Project Size: 1000000, Tags: Energy, Infrastructure, Solar, Wind, Power, Dam, Hydroelectricity, Renewable, Water, Environment., Funding Source: Government, Status: Pipeline

Several 20 MW solar, wind, run of river hydro projects

San Buenaventura wind project

Mar 1st, 2013 to Jan 1st, 2020
San Buenaventura, Costa Rica
Type: State Trade Lead, Project Size: 30500000, Tags: Energy, Power, Electricity, Renewable, Wind, Environment., Funding Source: Government, Status: Pipeline

A National Power and Light Company (CNFL) wind project of 8.5 MW. Turn-key delivery method.

Construction of Government Office Buildings

Mar 1st, 2013 to Jan 1st, 2020
Costa Rica
Type: State Trade Lead, Tags: Infrastructure, Construction, Construction, Funding Source: Government, Status: Pipeline

Costa Rica allows for PPP projects to be suggested by the private sector.˜ The national concessions agency is hoping for proposals regarding government office building construction.˜ The Embassy can help arrange appropriate contacts.

School and Education Ministry Office Building Construction

Mar 1st, 2013 to Jan 1st, 2020
Costa Rica
Type: State Trade Lead, Tags: Infrastructure, Construction, Construction, Education, Building, Funding Source: Government, Status: Pipeline

Costa Rica allows for PPP projects to be suggested by the private sector.˜ The national concessions agency is hoping for proposals regarding school and education ministry office building construction (NOT teaching services).˜ The Embassy can help arrange appropriate contacts.

Engineering oversight firm for highway projects

Mar 1st, 2013 to Jan 1st, 2020
Costa Rica
Type: State Trade Lead, Project Size: 1000000, Tags: Infrastructure, Transportation, Engineering, Engineering Supervision Contracts, Funding Source: Government, Status: Pipeline

The National Concessions Council (CNC) is likely to need an engineering oversight firm for one or more highway projects.

Elevated transformers for hydro-dam construction

Mar 1st, 2013 to Jan 1st, 2020
Costa Rica
Type: State Trade Lead, Project Size: 9700000, Tags: Energy, Infrastructure, Energy,electricity, Power, Dam, Hydroelectricity,, Funding Source: Government, Status: Pipeline

Elevated Transformers

Anonos hydro-electric plant.

Mar 1st, 2013 to Jan 1st, 2020
San Jose, Costa Rica
Type: State Trade Lead, Project Size: 15000000, Tags: Energy, Infrastructure, Hyroelectricity, Power, Dam, Renewable, Water, Energy,electricity, Funding Source: Government, Status: Pipeline

Improvement & modernizations of existing hydro plant